
Quick links to other Muon and Trigger/DAQ documents:
Twiki:
Cern TGC,
ELX Japan,
Operations,
Alignment
ATLAS Notes and Communications,
EDMS TGC
chambers and
electronics
Technical Proposal:
ATLAS High-Level Triggers, DAQ and DCS, 11 April 2000,
TDRs:
MUON,
Level-1
Status reports:
Trigger Performance,
DAQ, EF, LVL2 and DCS
Estimation of Radiation Background,
Impact on Detectors, Activation and Shielding Optimization in ATLAS
Selected useful links for Operation/Analysis:
Operation:
Operation Main page,
TGC expert online documentation,
TGC DCS,
Condition data base monitoring,
Point 1 monitoring
Offline:
Computing Workbook,
Physics analysis tools
Design (Version Q4, last update 13 Feb 2009)
TGC parameter book
(see revision record in page 3 of document):
Old Excel 97 file
New Excel 2007 file
(Zipped),
pdf.
TGC Numbering and Naming Scheme
TGC description in amdb format
Detailed breakdown of wire ganging
Physicist's drawings
(Paw macro to produce them)
Overall views
TGC Trigger (T.M) and 2nd-coordinates (T.I) planes
| Wheel | Active area | Faraday Cages | Envelopes | |
| EI/FI | Doublet | t_i_a.ps | t_i.ps | t_i_f.ps |
| M1 | Triplet | t_m1_a.ps | t_m1.ps | t_m1_f.ps |
| M2 | Doublet | t_m2_a.ps | t_m2.ps | t_m2_f.ps |
| M3 | Doublet | t_m3_a.ps | t_m3.ps | t_m2_3.ps |
Support structures and cable routing
(engineering drawings)
Wheel 1/2/3
inner Endcap and Forward sets
Attachment points in 1/12 sectors:
Wheel 1
R and L,
Wheel 2 R and L,
Wheel 3 R and L,
EI,
FI
CAD repository
Detector Contours
Engineering drawings | T01 | T02 | T03 | T04 | T05 | T06 | T07 | T08 | T09 | T10 | T11 | |
| Triplets | M1 | M1 | M1 | M1 | M1 | ||||||
| Doublets | M2-M3 | M2-M3 | M2-M3 | M2-M3 | M2-M3 | M2-M3 | M2-M3 | FI Regular, Short | EI Regular, Short |
Unit Large Stickers | T01 | T02 | T03 | T04 | T05 | T06 | T07 | T08 | T09 | T10 | T11 | |
| Triplets | U01B1I U01B1H U01F1I U01F1H | U03B1I U03F1I | U06B1I U06B1H U06F1I U06F1H | U08B1I U08F1I | |||||||
| Doublets | U06B2I U06B2H U06F2I U06F2H U06B3I U06B3H U06F3I U06F3H | U08B2I U08F2I U08B3I U08F3I | U09B2I U09F2I U09B3I U09F3I | U11B4I U11B4S U11F4I U11F4S |
Alignment Holes (engineering drawings, as of October 2003)
Drawings (in PDF format) :
High Eta,
Medium Eta
View of two beams accross all stations:
jpeg,
pdf
Unit thicknesses
Layout of all wire adaptors
TGC Construction Manual: Main manual and
Supplier's Data Sheets (PDF)
Construction Schedule (version D, Oct 2001): MS-Project file
((zipped), PDF .
TGC Flammable Gas Safety Report: PDF
and PostScript
Production database software:
Parts list
Wire Pads for chambers | Type | T01 | T02 | T03 | T04 | T05 | T06 | T07 | T08 | T09 | T11 | T11S |
| Update | 01 Feb 04 | 01 Sep 04 | 01 Feb 04 | 27 Nov 02 | 27 Nov 02 | 23 May 01 | 28 Apr 00 | 23 Mar 00 | 20 June 01 | 03 Feb 04 | 03 Feb 04 |
| A3 multipage | td> | ||||||||||
| A4 multipage | ps | ps | ps | ps,pdf | ps,pdf | ps,pdf | ps,pdf | ps | ps | ||
| A2 one-page | ps | eps | eps,pdf | eps,pdf | eps |
Details of wire
pads
Automatic updates:
T01,
T02,
T03,
T06,
T08,
T09,
T10,
T11,
Packages,
Cern Balance
Manual Update (last 18 August 2005):
Summary Plots
Detectors production,
Units progress,
Global Progress,
Some global QC plots,
Excel file
Detailed plots: | Type | Where | History of Production | QC plots | Original Excel file | Details | Cosmics Tests |
| T01 | Israel | Detectors, Units | H-detectors, K-detectors, Detectors, Units | t01-qc.xls | Index | Cosmics tests plots Log |
| T02 | Israel | Detectors, Units | H-detectors, K-detectors, Detectors, Units | t02-qc.xls | Index | Cosmics tests plots Log |
| T03 | Israel | Detectors, Units | H-detectors, K-detectors, Detectors, Units | T03-qc.xls | Index | Cosmics tests plots Log |
| T06 | Israel | Detectors, Units | H-detectors, K-detectors, Detectors, Units | T06-qc.xls | Index | Cosmics tests plots Log |
| T08 | Israel | Detectors, Units | H-detectors, K-detectors, Detectors, Units | T08-qc.xls | Index | Cosmics tests plots Log |
| T09 | China | Detectors, Units | H-detectors, K-detectors, Detectors, Units | T09-qc.xls | Index | Cosmics tests plots Log |
| T10 | Israel | Detectors, Units | H-detectors, K-detectors, Detectors, Units | T10-qc.xls | Index | Cosmics tests plots Log |
| T11 | Israel | Detectors, Units | H-detectors, K-detectors, Detectors, Units | T11-qc.xls | Index | Cosmics tests plots Log |
Weizmann database:
Details of all Units
Cosmics tests databases:
Technion,
Tel-Aviv
Production in Japan
Production forecast
Certification Data Base
Cosmic & source Tests
List of runs ,
problems log-books,
hot channels
Sector Photogrammetry
Excel file,
Root program
and plots:
Summary of wheel commissioning
TGC1-A,
TGC2-A,
TGC3-C
TGC3-A
Error messages from Acrobat Reader from documents below? PDF files generated in Japan often
use latin fonts which cannot be displayed by the Acrobat Reader on western systems.
To view and print these files you must download the
Japanese font pack from Adobe.
Design pages in Japan: TGC Electronics,
Hasuko's TGC Electronics pages,
Osamu Sasaki's page,
PSPACK details
Documents and presentations at TGC Workshops and other meetings
Documents collected for electronics reviews
The Off-chamber Final Design Review
TGC ROB input format (i.e. TGC bytestream) and
TGC ROD page
How to replace a TGC ROD in USA15
Revised Muon Endcap chapter of the Level-1 Trigger TDR,
Rev 01, 9 June 2000 and
the update of Chapter 12.6and 12.7 of the revised document.
Related ATLAS documents - Level-1 Muon Trigger URD, Version 2.1, 9 November 2002
- Interfaces and Overlaps in the Level-1 muon trigger system, Revision 10, May 2001
- Trigger & DAQ Interfaces with Front End systems: Requirements Document, ATLAS-DAQ-NO-103, Version 2.0, 9 June 1998
- ATLAS Detector Control System, User Requirements Document, Draft 1.0, 22 Nov. 1995
Links to related Electronics, Trigger, DAQ pages - ATLAS electronics coordination
- ATLAS DAQ Prototype -1 Technical Notes
- DIG/RODWG pages
- TTC web page
- Racks & Crates in ATLAS
Complete repository (not yet organised)
Pictures of the Weizmann Production Lab
Warehouse:
1,
2,
3
Honeycomb and Fiberglass Frames:
1,
2,
3,
4,
5,
6,
7,
8
Graphite Masking, Spraying & Resistivity checking:
1,
2,
3,
4,
5, 6
Half detectors gluing:
1,
2,
3,
4,
5,
6,
7,
8,
9
New Winding Machine:
1,
2,
3,
4,
5,
6,
7,
8,
9,
10,
11,
12,
13,
14,
15,
16,
17,
18,
Movies: 1,
2
Winding process:
1, 2,
3, 4,
5, 6,
7, 8,
9, 10,
11, 12,
13, 14
Detector closure in clean room: 1,
2,
3,
4,
5
Unit Gluing and assembly: 1,
2,
3,
4,
5,
6,
7,
8
Details of electronic components and boards,
Gas inlets, Kinematic supports : 1,
2,
3,
4,
5,
6,
7,
8,
9,
10,
11,
12,
13
HV pulse tests: 1,
2,
3,
4,
5,
6,
7,
8,
9,
10
Detectors and Units storage: 1,
2, 3,
4,
5
Data Base:
1,
2
Pictures of the Weizmann Test Lab:
1, 2,
3, 4,
5, 6
Pictures of the Technion Test Bench:
1,
2,
3,
4,
5,
6,
7,
8,
9,
10,
11,
12,
13,
14,
15,
16,
17
Wires under Electronic Microscope:
1,
2,
3
Transportation to Cern
Top of page
Weizmann home page
Last update: 22 April 2007 by Daniel Lellouch